Chapter V - Section 49.3 D
Drainage Facilities


D.   DRAINAGE FACILITIES

    1.   Dedication

    The landowner shall dedicate the entire right-of-way or easement for all drainage and other facilities within the area to be developed as required by the Department of Transportation.

      a.   Dedication shall include right-to-access if so required. The width of such dedication shall be in conformance with the El Paso County Engineering Criteria Manual and shall be so noted on the plat.

    2.   Construction

      a.   The developer shall construct all drainage, bridges and related structures within a subdivision.

      b.   In cases in which drainage structures must be extended to or beyond the subdivision, the developer shall pay the entire cost of the extension, subject to appropriate payback agreements as provided for in this Section. Such improvements shall be considered, for review purposes, a part of the subdivision and shall be constructed to County standards.

      c.   If the developer is not authorized to extend drainage facilities beyond his property, he may redesign his drainage plan in conformance with the Engineering Criteria Manual.

    3.   Credit for Facilities

      a.   The subdivider may be credited for drainage facility construction costs incurred which are identified in the applicable Drainage Basin Planning Study. Upon the completion and probationary acceptance of the drainage facilities for a subdivision as required, the unit drainage basin fees payable by the subdivider upon the land in the subdivision or that portion thereof will be computed. Drainage basin fees for the subdivision shall be based upon the fees payable at the time of final plat recording unless any changes in fees, to account for inflation, have been approved by the Board of County Commissioners, in which case the fees shall be those in effect at the time of bid opening for the drainage facilities construction. If, at the time of bid opening, the amount of said fees is less than the cost of providing the aforesaid facilities, the subdivider shall be entitled to a credit from the appropriate sub-fund for the basin involved, payable from the Subdivision Storm Drainage Fund. This credit shall be in an amount that the cost of providing said facilities exceeds the drainage basin fees payable by said subdivider, and is reimbursable subject to the availability of funds. If the final approval is applicable to only a portion of the subdi-vision or tract or tracts of land owned by the subdivider and located within the same drainage basin, at the option of the subdivider, the credit for the cost of the facilities installation in excess of the drainage basin fees may be applied upon and credited to the drainage basin fees due upon the balance of the said subdivision or tract or tracts of land; provided how-ever, that the subdivider furnishes the Subdivision Storm Drainage Board satisfactory evidence that the subdivider owns the subdivision or tract or tracts of land or has entered into a written contract to purchase the same, as of the date that application for said credit is made.

      b.   Determination of Credit for Drainage Facilities. The credit to which a subdivider shall be entitled from the appropriate subfund of the basin involved in the Subdivision Storm Drainage Fund, as set forth in sub-section a. above, shall be determined on the basis of the actual cost incurred in constructing the drainage facilities, plus ten percent (10%) for engineering expense. The subdivider shall be responsible for contracting for the construction of the drainage facilities after receiving at least three (3) sealed bids for construction of the drainage facilities. If the sub-divider is unable to get at least three (3) sealed bids the Director of Transportation shall be responsible for determining that the bids received are the lowest responsible bids. The decision of the Director of Transportation may be reviewed by the Drainage Board. Bidders must be on the approved contractor list. Should the bids exceed the estimate of the cost of constructing the drainage facilities as set forth in the approved drainage plan, they shall be rejected unless the subdivider's engineer and the Director of the Department of Transportation or his designated representative determine that any bid exceeding the engineer's estimate is the lowest responsible bidder. Although the subdivider is ordinarily expected to accept the lowest responsible bid, the subdivider may declare his desire to accept a higher bid. If such is the case any credit shall be based on the lowest responsible bid. Any disputes pertaining to this Section shall be referred to the Drainage Board for review, and recommendations of such Board may be approved or disapproved by the Board of County Com-mis-sioners.

      c.   Determination of credit for land used for public detention facilities. The credit to which a subdivider shall be entitled from the appropriate sub-fund of the basin involved in the Subdivision Drainage Fund shall be determined on a per acre basis as set forth in the appropriate approved Drainage Basin Planning Study. The per acre land credit shall be equal to and limited by the unit detention reservoir land fee in use at the time of detention facilities by the subdivider.

      d.   Credit may be given to any entity or individual who constructs facilities which are included in the County plan for development of drainage basins (applicable Drainage Basin Planning Study), such plan being the basis for drainage fees, in a manner consistent with the above paragraph 3.b. or 3.c.

    4.   Drainage Basin Fees

    Drainage fees are as per the schedule adopted by the Board of County Commissioners.

    Identified Drainage Basins are as follows:

CYCY0400 West Cherry Creek
FOFOO200 Young Hollow
FOFOO400 Williams Ranch
FOFOO600 Sand Creek
FOFOO800 Midway Ranch
FOFO1000 Lower Williams Creek
FOFO1200 Crooked Canyon
FOFO1400 Calhan Reservoir
FOFO1600 Sand Canyon
FOFO1800 Little Fountain Creek
FOFO2000 Jimmy Camp Creek
FOFO2200 Fort Crson
FOFO2400 East Big Johnson
FOFO2600 Big Johnson
FOFO2800 Carson Street
FOFO2900 Widefield
FOFO3000 Windmill Gulch
FOFO3100 Security
FOFO3200 Little Johnson
FOFO3400 Peterson Field
FOFO3600 Fishers Canyon
FOFO3800 Stratton
FOFO4000 Sand Creek
FOFO4200 Spring Creek
FOFO4400 Shooks Run
FOFO4600 Southwest Area
FOFO4800 Bear Creek
FOFO5000 Midland
FOFO5200 Westside
FOFO5400 21st Street
FOFO5600 19th Street
FOFO5800 Camp Creek
FOFO6000 Palmer Trail
FOFO6200 Columbia
FOFO6400 Sutherland Creek
FOFO6600 Balanced Rock
FOFO6800 Black Canyon
FOFO7000 Ruxton Creek
FOFO7200 Williams Canyon
FOFO7400 Manitou Reservoir
FOFO7600 Upper Fountain Creek
FOMOO200 Monument Valley
FOMOO400 Mesa
FOMOO600 Papton
FOMOO800 Rosell
FOMO1000 Douglas Creek
FOMO1200 Templeton Gap
FOMO1400 Popes Bluff
FOMO1600 South Rockrimmon
FOMO1800 North Rockrimmon
FOMO2000 Pulpit Rock
FOMO2200 Cottonwood Creek
FOMO2400 Dry Creek
FOMO2600 South Pine Creek
FOMO2800 Pine Creek
FOMO3000 Kettle Creek
FOMO3200 Air Force Academy
FOMO3400 Elkhorn
FOMO3600 Black Squirrel Creek
FOMO3700 Middle Tributary
FOMO3800 Monument Branch
FOMO4000 Smith Creek
FOMO4200 Black Forest
FOMO4400 Jackson Creek
FOMO4600 Beaver Creek
FOMO4800 Teachout Creek
FOMO5000 Monument Rock
FOMO5200 Dirty Woman Creek
FOMO5400 Palmer Lake
FOMO5600 Raspberry Mountain
FOMO5800 Upper Monument Creek
FOW10200 Lower Williams Tributary
FOW10400 Upper Williams Tributary
FOW10600 Upper Williams Creek
HAHA0200 West Haynes
HAHA0400 East Haynes
HAHA0600 Haynes Creek
HOHOO200 Little Horse Creek
HOHOO400 North Fork
HOHOO600 Horse Creek
HOPOO200 St. Lukes
HOPOO400 Lower Pond Creek
HOPOO600 Upper Pond Creek
HOPOO800 Rush
HOPO1000 Steels Fork
KIKI0200 West Kiowa Creek
KIKI0400 East Kiowa Creek
KRKR0200 West Kramer
KRKR0400 Kramer Creek
KRKR0600 East Kramer
PLPL0200 Bald Mountain
PLPL0400 Carpenter Creek
PLPL0600 Plum Creek
TRTR0200 Trout Creek
TUTU0200 Turkey Creek
BEBE0200 Red Creek
BEBE0400 Upper Beaver Creek
BGBG0200 Mustang Creek
BGBG0400 Simla
BGBG0600 Ramah
BGBG0800 Antelope Creek
BGBG1000 Calhan
BGBG1200 Lenard
BGBG1400 Upper Big Sandy Creek
BIBI0200 Bijou Creek
CHBG0200 West Big Springs Creek
CHBG0400 Upper Big Springs Creek
CHBR0200 Battett
CHBR0400 La Vega Ranch
CHBR0600 Upper Brackett Creek
CHBS0200 Squirrel Creek
CHBS0400 Lower Dry Squirrel
CHBS0600 Lower Black Squirrel
CHBS0800 Book Ranch
CHBS1000 Crows Roost
CHBS1200 Ellicott Consolidated
CHBS1400 Lower Big Springs Creek
CHBS1600 Ellicott
CHBS1800 Hook and Line Ranch
CHBS2000 Upper Black Squirrel
CHCOO200 Windmill
CHCH0400 Finch Ranch
CHCH0600 West Chico Creek
CHCH0800 Lower East Chico
CHCH1000 Hammer Ranch
CHCH1200 West Chico Tributary
CHCH1400 Chico Creek
CHCH1600 Upper Chico Creek
CHDS0200 Upper Dry Squirrel
CHDS0400 Drennan
CHEC0200 Middle East Chico
CHEC0400 Upper East Chico
CHMS0200 Haegler Ranch
CHMS0400 Gieck Ranch
CHSW0200 Telephone Exchange
CHWS0400 Livestock Company
CHWS0600 West Squirrel
CHWS0800 Solberg Ranch
CHWS1000 Curtis Ranch
CHWS1200 Bennett Ranch
CHWS1400 Falcon
CYCY0200 East Cherry Creeek

    5.   Applicability of Provisions

      a.   Land not otherwise excluded or exempted under D.7.,

        1)   Upon which drainage fees have not been assessed, or

        2)   Upon which drainage facilities have not been built in accordance with accepted detailed drainage plans and specifications, or

        3)   Upon which detailed drainage plans and specifications have not been submitted, shall not be finally replatted or resubdivided until the terms of this plat are complied with.

      b.   Land

        1)   Upon which drainage fees have been paid, or

        2)   Upon which drainage facilities have been built in accordance with accepted detailed plans and specifications, may be replatted or re-subdivided without additional assessment of drainage fees if there is not an increase in the number of lots replatted, additional acreage is not included in the replat, or a rezoning of the land has not occurred since the previous plat.

    6.   Exclusions and Exemptions

    Drainage fees shall not be imposed upon any subdivision which has received Final Plat approval from the Board of County Commissioners on or before December 17, 1984, except for lands being replatted.

    7.   Annexed Lands

    The owner or owners of lands which have been annexed to the City upon the condition and understanding that said lands would be subject to the City's drainage control ordinance.

    8.   Drainage Plan

    (see Section 51.1, Drainage and Erosion Control Plans)

 

              ...back to main code page

              Customer Services/ Planning Division Manager
              Mike Hrebenar

              Engineering Division Manager
              Paul Danley

              Long Range Planning Division Manager
                Carl Schueler

              Location:
              2880 International Circle Colorado Springs, CO 80910

              Telephone:
              (719)520-6300

              Fax:
              (719)520-6695

              Hours:
              7:30AM - 4:30PM
              Monday - Friday
              (except holidays)

              Copyright 2005
              El Paso County, CO

               

              Site Search
              Disclaimer Copyright 1996-2007 El Paso County, CO