Development Services Home
El Paso County Home
| Home | Agendas | Committees | Comprehensive | Operational |

Tri-Lakes Comprehensive
Plan Update
DRAFT

In Appreciation


Map - Overview of the Planning Area

Table of Contents

Overview and Plan Summary

Introduction

The Vision - The Mission

Topical Sections:

Plan Overlays:

Sub-Area Plan Sections:

Maps:

  • Concept Plan
  • Transportation
  • Parks, Trails and Visual Resources
  • Development Status
  • Zoning

Implementation Plan:

  • Introduction
  • Approach
  • Implementation Program

ECONOMIC DEVELOPMENT (EC)

VISION STATEMENT

The Tri-Lakes Planning Area presents a variety of unique economic development opportunities for smaller type of business ventures that rely on high visibility. Interstate 25 is the entrance into El Paso County, the Tri-lakes Area, The Town of Monument, and the City of Colorado Springs from the north and what is located along the Corridor forms a lasting impression. The vision includes economic development of high quality while allowing reasonable flexibility for landowners and developers to meet the quality of life and environmental expectations of the community.

GUIDING PRINCIPLE

  • Preserve, protect and enhance the quality of life for residents, especially the inherent beauty of the area.
  • Accommodate growth through balanced, commercial, industrial and residential development.

New Housing Construction Courtesy: Andy de Naray

BACKGROUND

In 1983 when the first Comprehensive Plan was approved commercial development in the unincorporated County was generally located in two areas: at the Baptist Road/I-25 interchange and the western edge of Woodmoor and I-25. There were no major concentrations of industrial uses. The 1983 Plan recommended that new regional commercial and industrial be located in municipalities if adequate facilities and services were available. Since the 1983 Plan was approved, Monument has annexed most of the property along the I-25 corridor.

Most of the economic development in Tri-Lakes centers around the home building industry. Non-residential development has occurred primarily outside the jurisdictional limits of the County within the municipal limits of Monument and Palmer Lake. The municipalities depend on commercial businesses to generate sales tax revenue.

I-25, as a regional transportation corridor, has the potential of attracting both commercial and office development. Development along this corridor has somewhat lagged behind the adjacent residential developments to the east and west. The exceptions to this is the development that has occurred within the Town of Monument along SH 105 and within the unincorporated County at the Baptist Road Interchange. The challenge then, is to attract economic development that is consistent with the community's expectations while at the same time preserving the quality of life residents of the Tri-Lakes Area enjoy.

ISSUE EC.1 ECONOMIC DEVELOPMENT

The 1983 Plan recommended that higher density housing and non-residential commercial, office and light industrial development be located near the I-25 corridor and within the Town of Monument where infrastructure was available. This is supported in the 1999 Updated Plan.

In the 1983 Plan, several intersections along SH 83 were designated for future commercial. The commercial designation for these intersections are being reconsidered due in part to the relatively low densities that were developed, the lack of infrastructure necessary to support most commercial land uses, and the community objectives of retaining the rural character and transportation efficiency along this corridor.

Finding suitable locations for industrial land uses becomes more challenging as the area develops. For instance, there is often a need for construction related industry such as lumber sales and concrete batch plants. Although there are a number of industrial-type businesses such as R-Rock Yard and Ray's Diggins, no specific areas are designated for this type of use.

Water Supply
The water supply options in the planning area limit the type and size of economic development that can take place. Businesses with greater demand for water than allowed for under a domestic well permit must locate within the boundaries of an existing water and sanitation district or establish a new district.

Transportation
Access onto major roadways in the planning area is restricted or difficult due to the limited number of arterial roads and the increases in traffic. Restricting access along major roadways with limited points of ingress and egress can alleviate this by reducing congestion and traffic confrontations.

Space Limitation
The amount of land available for non-residential uses is limited within the planning area. This is due to a lack of developable land with the I-25 corridor. It is compounded by pressure from area residents to retain some of the character of the natural landscape long the I-25 corridor and many of the arterial roadways.

GOAL
To support economic development that enhances a sense of community, is compatible with surrounding land uses, is sensitive to the natural landscape, and is consistent with community expectations concerning preservation of the area's quality of life.

OBJECTIVES

EC.1.1 Encourage the centralization of major economic development in the I-25 corridor and other designated areas.

EC.1.2 Ensure that development proposed for along I-25 is consistent with the goals and objectives of the I-25 Visual Overlay as outlined in this Plan.

EC.1.3 Consider only community-based economic development that is adaptable to the unique conditions of the individual Sub-Areas, when such development is located outside the limits of the I-25 corridor or in other areas specified for high-impact commercial or industrial businesses.

EC.1.4 Consider SH 83 primarily as an arterial transportation corridor. Discourage economic development that would significantly disrupt traffic flow. Limit economic development to activities that are compatible to and serves the needs of the local community.

PROPOSED ACTIONS

EC.1.5 Participate in developing a plan that identifies economic development goals, objectives, and strategies that are harmonious with community expectations.

EC.1.6 Promote cooperation between public and private interests to establish an economic development plan that identifies businesses which will meet or exceed community expectations.

EC.1.7 Locate land uses, such as office and industrial parks, where infrastructure is available or provisions are guaranteed.

EC.1.8 Centralize major economic development in the I-25 corridor or other designated areas.

EC.1.9 Minimize adverse environmental impacts of non-residential development, such as soil erosion, excessive exterior lighting and alterations to natural drainage channels.

 

Customer Services/ Planning Division Manager
Mike Hrebenar

Engineering Division Manager
Paul Danley

Long Range Planning Division Manager
  Carl Schueler

Location:
2880 International Circle Colorado Springs, CO 80910

Telephone:
(719)520-6300

Fax:
(719)520-6695

Hours:
7:30AM - 4:30PM
Monday - Friday
(except holidays)

Copyright 2005
El Paso County, CO

 

Site Search
Disclaimer Copyright 1996-2007 El Paso County, CO