SP-01-013
713.33
PRELIMINARY PLAN
HAY CREEK RANCH
A
request by Hay Creek Ranch L.L.C. for Preliminary Plan approval
of a 15-lot subdivision of 50.243 acres. The property is located
in the Tri-Lakes area, south of Hay Creek Road and west of Interstate
25 in the Southeast Quarter of Section 33 and the Southwest Quarter
of Section 34, both in Township 11 South, Range 67 West of the 6th
P.M., El Paso County, Colorado. The property is zoned RR-3 (Rural
Residential) Zone District with a change in zoning to PUD (Planned
Unit Development) District pending. Assessor's Tax Schedule #71000-00-319.
WAIVERS:
1) Waiver of Section 49.2.C.3.2.a pertaining to the reduction of
right-of-way width where suitable alternative provisions are made
for pedestrian walkways and utilities. A 50' right-of-way is proposed
where 60' is required.
2) Waiver of the requirement requiring a curve radius of 300'. A
curve radius of 150' is proposed.
3) Waiver of the El Paso County Paving Policy.
4) Waiver of the requirement there be no more than 10 lots on a
non-through street. (#4 Added at the meeting).
PLANNING
COMMISSION ACTION: The request was denied unanimously (7-0)
at the March 19, 2002, meeting of the Planning Commission.
For
Those Speaking For/ Against. Public Notice and Notification, Adjoining
Property Owner Responses/ Comments, Adjoining Land Use and Zoning,
refer to the previous item, PUD-01-007.
HISTORY
- The property was zoned A-4 (Agricultural - five-acre) on November
15, 1954. The A-4 (Agricultural) was converted to RR-3 (Rural Residential
- five-acre) in 1991.
AGENCY
COMMENTS
OFFICE
OF THE STATE ENGINEER
We
have received your November 1, 2001 submittal concerning the above
referenced proposal to subdivide 50.29 acres into 15 residential
lots. The estimated water requirements were given as 7.35 acre-feet
annually. The proposed source of water is wells, utilizing 2 existing
Dawson aquifer wells (permit no. 13414 decreed in case no. 84CW15
and permit no. 167807 decreed in case nos. 84CW16 & 92CW11)
and up to 15 new Denver aquifer wells.
The
applicant has a pending court case, no. 01CW21, to adjudicate the
available water in the Dawson and Denver aquifers and to adjudicate
a plan for augmentation to allow for the withdrawal of those waters.
That case has not yet been decreed. Upon its decree the 2 existing
Dawson aquifer wells will have to be re-permitted as non-exempt
wells to operate pursuant to that decree, and the rights decreed
in case nos. 84CW15, 84CW16 & 92CW11 abandoned.
Pursuant
to the provision of C.R.S. 30-28-136(1)(h)(I) it is the opinion
of this office that until the Water Court issues a decree in case
no. 01CW21, the applicant obtain new permits for the 2 Dawson aquifer
wells, and the existing Dawson aquifer rights abandoned, the proposed
water supply has not been adequately confirmed and would injure
decreed water rights. If you have any questions please contact Keith
Vander Horst of this office.
OFFICE
OF THE COUNTY ATTORNEY submitted the following Findings and
Conclusions:
1)
This is a proposal by Hay Creek, L.L.C., requesting to subdivide
50.243 acres into 15 lots. The property is currently zoned RR-3
and is located in the Northeast quarter of the Southeast quarter
of Section 33 and the Northwest quarter of the Southwest quarter
of Section 34, all in Township 11 South, Range 67 West of the 6th
P.M., El Paso County, Colorado.
2)
The Applicant has provided for the source of water to be from both
new and existing individual on-lot wells. Existing wells, Well Permit
Nos. 13414 and 167807, withdraw from the Dawson Aquifer, and the
new wells are proposed to withdraw from the Denver Aquifer. The
Applicant estimates its annual water needs to serve households at
4.05 acre-feet, and irrigation of lawn and gardens at 3.30 acre-feet
resulting in a total of 7.35 acre-feet. Applicant will have to be
able to provide a supply of 2,205 acre-feet of water (7.35 ac.ft./yr.
x 300 yrs.) to meet the County's 300 year water supply requirement.
3)
In a letter dated November 19, 2001, the State Engineer indicates
that Applicant has decreed water rights from Court Decrees 84 CW
15 (Well Permit No. 13414) and 84 CW 16 & 92 CW 11 (Well Permit
No. 167807) allowing the withdrawal of water from the Dawson Aquifer.
The Applicant is seeking an amended decree for adjudication of water
rights to allow withdrawal of water from the Dawson and Denver Aquifers
and a plan for augmentation in pending water court Case No. 01 CW
21. The engineer states that once decreed, the two existing Dawson
Aquifer wells will have to be re-permitted as non-exempt wells to
operate pursuant to that decree, and the rights decreed in Case
Nos. 84CW15, 84CW16, and 92CW11 will have to be abandoned. Pursuant
to C.R.S. §30-28-136(1)(h)(I), the State Engineer is of the
opinion that until the Court rules on pending Case No. 01 CW 21,
the applicant obtains new permits for the two Dawson Aquifer wells
and the existing Dawson Aquifer rights are abandoned, the proposed
water supply has not been adequately confirmed and would injure
decreed water rights.
4)
The water quality requirements of Section 49.5E(2) of the Land Development
Code must be satisfied.
5)
Therefore, at this time, until a finding of sufficiency with no
injury to existing water rights can be made by the State Engineer's
Office, the plan for augmentation is approved, and a final signed
decree is received from the Water Court in Case No. 01 CW 21, the
County Attorney's Office would recommend a finding that the proposed
water supply is insufficient in terms of quantity and dependability.
The El Paso County Health Department shall provide an opinion as
to quality.
EL
PASO COUNTY DEPARTMENT OF TRANSPORTATION
The
following are the remaining Department of Transportation comments
pertaining to the resubmittals for the above referenced subdivision.
Preliminary
Plan:
1) No legal or general notes were provided with revised Preliminary
plan. There is no reference to the "See Note 5" on the
Preliminary Plan.
2)
The roadway cannot be included in the preservation easement. In
addition the potential septic leach fields may not be permitted
in the preservation easement. It is recommended the area between
the roadway easement to the north side flood plain be changed back
to just an open space easement.
3)
Hay Creek Road, north of the site is shown on the plan to have "18'
ROW asphalt surface". The Delacroce property has 60' of ROW
up to the point it crosses this site. Show the 60 feet of right-of-way
to be continuous through this project site.
4)
What 100-year flow quantity was used to determine the actual 100-year
floodplain lines on the preliminary plan?
Preliminary
Drainage Report:
1) Under Section 1.1 it states that all roadways will meet County
standards, which is not correct.
2)
Section 1.3, item 5 has a statement that no LOMR is required as
all proposed building envelopes are located outside the regulatory
and site-specific mapped 100-year floodplains. A note needs to be
placed on the preliminary plan and final plat stating the 100-year
flood plain areas are no-build zones. Based on this statement no
new construction could occur on Lot 15 and limited buildable site
areas would exist on lots 12, 13, and 14.
3)
The NRCS method runoff flows presented in Table 1 appears to be
low based on the basin area and soil types as presented in the Monument
Creek Drainage Basin Planning Study performed by Kiowa Engineering,
dated May 1992. Based on the data presented on the computer printout
sheets for the EPA-SWMM method, the 2-hour storm event was used.
Section 5.3.3 of the DCM states that two storm distributions will
be utilized, two (2) and twenty-four (24) hour duration storms.
The design storm is the one producing the greatest level of protection
for flood conveyance and storage facilities. The 24-hr. storm event
generally produces the greater flow and is used in El Paso County.
4)
The runoff curve numbers for the off-site basins need to be revised
based on the values presented in the Monument Creek Drainage Basin
study.
5)
Provide the off-site basins data in a tabulated form.
6)
The drainage report needs to address the off-site drainage flows
based on the SCS 24-hr., 100-yr. storm. The report needs to state
the storm event used in the report.
7)
In Section 4.1, two Hay Creek crossings are presented. With the
revised preliminary plan only one crossing is proposed. Also, in
Section 4.1, the second paragraph states there will be no direct
connected impervious areas and runoff from roadways, driveways,
and roofs will flow onto adjacent pervious areas. Provide discussion
on how the roadside ditch flows will be handled in light of these
statements.
8)
Provide existing and proposed flow rates at all design points.
9)
Previous comment (January 3, 2002): A statement is made in Section
4.2, under Site Hydrology for Management of Stormwater Runoff that
flows increase by 13% because the on-site drainage area increases
due to the roadway ditches. This statement needs to be clarified
as runoff flows from Basin C1 are shown on the proposed condition
map to be directed, by the roadway, to a discharge point below Design
Point 2. (New comment) Table 2, also shows Basin C1 is included
in Design Point 2 discharge flows. The drainage map shows flows
from Basin C1 to enter the channel below Design Point 2.
10)
The 2002 drainage fee for Beaver Creek Basin is $5773.00 per impervious
acre. Lots greater than or equal to 2.5 acres can apply a 25% reduction
to the drainage fee.
11)
The waiver request needs to be re-evaluated with the revised design
point quantities and drainage structure. The crossing will still
need to meet Table 6-1 of the DCM.
12)
On the runoff coefficient computation form, the contributing percentages
for Basins OSA and OSC do not add to 100%.
STAFF
NOTE: DOT has indicated that these comments will not prevent this
item from being heard by the Planning Commission. All outstanding
issues will be resolved prior to the item being heard by the Board
of County Commissioners.
COLORADO
GEOLOGICAL SURVEY
Letter
dated November 26, 2001
In response to your request and in accordance with Senate Bill 35
(1972), 1 visited the site on November 20, 2001 and reviewed the
site plan. The site consists of 50.2 acres to be rezoned and developed
to include 15 residential lots ranging in size from 3.07 to 4.29
acres. Included in the review package were:
1)
Letter of Intent (10/29/0 1) by Matrix Design Group
2)
Rezoning Justification (10/29/0 1) by Matrix Design Group
3)
Preliminary Plan (10/0 1) by Matrix Design Group
4)
Development Plan (10/0 1) by Matrix Design Group
5)
Erosion Control Plan (10/0 1) by Matrix Design Group
6)
Master Development Drainage Plan and Final Drainage Report (10/
19/0 1) by Matrix Design Group
7)
Soil, Geology and Wastewater Study (10/1701) by Entech Engineering
Individual
wells and septic systems will be installed on each lot. Building
envelopes were designated on the preliminary plan. Hay Creek flows
through the site from west to east, but the building envelopes are
outside of the 100?year flood plain.
The
site is located along Hay Creek, west of Baptist Road in a ranch
area. Hay Creek drains the site east into Monument Creek. Primary
geologic deposits consist of loosely compacted cobbley alluvium
and colluvium over the upper Dawson member. The hillsides along
the I 00?foot high ridge at the southern end of the site are prone
to creeping soils. Evidence of possible shallow landslides was observed
during the site visit. Consolidation testing was not performed at
this site; however, high consolidation (indicating potentially collapsible
soils) has been found in nearby areas (Forest Lakes PUD). Sporadic
swelling soils and bedrock are known to exist. Groundwater levels
vary, but may be shallow in areas near drainages.
The
Preliminary Plan shows building envelopes for each lot as example
building footprints that would accommodate an 80'x80' (6400 square
foot) dwelling. CGS is assuming that the example footprint locations
are not limited to the locations shown on the preliminary plat at
this time. Specific concerns regarding the geologic conditions of
the site are as follows:
·
Hillsides Entech Engineering has mapped much of the southern hillsides
as having down slope creep. During the site visit, much of the vegetation
mat on these slopes was not well knit and showed evidence of movement.
Areas on the hillsides of lots 1, 8, 9, and 10 had circular areas
with hummochy topography that is indicative of shallow slumps or
skin slides. Additionally, evidence of ongoing erosion was evident
throughout the hillside areas. Down slope movement and erosion are
both greatly increased by vegetation disturbance and increased soil
water (due to seasonal fluctuations and irrigation). Since there
is room within the building envelopes to build houses outside of
the down slope creep area, modification of the building envelopes
to exclude the hillsides should be considered in order to avoid
potential problems associated with creep, shallow landslides, and
accelerated erosion. Minimal disturbance to the natural vegetation
and prompt re?vegetation of areas after construction will also help
reduce the movement of the soil.
·
Swales Several secondary swales that could carry runoff to Hay Creek
were observed on the southern hillsides in lots 1, 3, 7, and 8.
Building envelopes should avoid these areas so that natural drainage
ways are not disturbed and structures are not flooded by seasonal
runoff.
·
Lot I The preliminary plan shows an example building footprint on
the top of the ridge on this lot. The ridge in this area is rather
narrow and quite steep on either side, which does not allow for
an appropriate set back from slopes already showing signs of creep
and possible shallow skin slides. It would be less problematic to
place any structures on this lot on the gentle slopes in the northwest
comer of the existing building envelope. Revising the building envelope
to avoid the hillside and ridge may be necessary.
·
Drainage Although groundwater was not encountered in either of the
two 15?foot boreholes, elevated water levels may occur due to seasonal
fluctuations, irrigation, and septic systems. Foundation drains
for subsurface construction would minimize damage from elevated
groundwater situations. Additionally, because percolation rates
were variable, lot?specific percolation tests should be conducted
in order to accurately design septic systems.
In
summary, there are geologic concerns with building on the hillsides
of this site. Building envelopes should be refined to minimize impacts
from creep, shallow landslides, accelerated erosion, and drainage
routes. There appears to be plenty of room for building as the lots
currently are platted. Lot?specific soils and percolation investigations
should be conducted prior to any construction. The recommendations
made by Entech should be followed and implemented. If you have further
questions about this site, please do not hesitate to contact me
at 303?866?3518.
Letter
dated December 13, 2001
I reviewed the faxed letter from Entech dated 12/5/01 responding
to my comments regarding the buildability of lot I at the eastern
edge of the property. The proposed building location sits on the
crest of a ridgeline with steep hillsides on either side that were
mapped as creep areas in the Soil, Geology and Wastewater Study
done by Entech (10/17/01). Entech's letter indicates they believe
that there is room to allow for a building pad on this ridgeline
and indicates the need for additional investigation of this lot.
I
am still concerned about building on this site. Not only is there
the creep zone to worry about, but accelerated erosion on those
gravelly slopes which could easily impact a structure placed here.
Should building occur on this hilltop, I would recommend at least
a 20' setback from the edge of the hillslope. Entech's letter did
say that "should the building pad encroach on the downslope
creep area, mitigation will be required"; however, did not
depict where "encroaching" would begin. Foundation support
will be necessary, but additional measures to reduce erosion due
to increased runoff from the impermeable surface of the structure
and irrigation need to be addressed if this is where they are building.
I
still think, since they have an option of a safer, less expensive
area to build down on the gentle slope below the ridgeline, that
is the best bet.
If
you have further questions about this site, please do not hesitate
to contact me at 303?8663518.
Letter
dated January 4, 2002
I attended a meeting with representatives from the Hull family,
Entec, and CGS on January 2, 2002 at the Hay Creek Ranch site to
review the comments made during the preliminary plan review. Of
particular concern were the site conditions at Lot 1, particularly
the downslope creep area.
Entec
has re?mapped the downslope creep areas at this site to reflect
a more precise location of the potential creep hazard. Most of these
areas will probably fall within the 30% grade restriction the county.
All parties agree that buildings could be built in some areas of
the downslope creep zone; however may be VERY costly, and other
factors (such as septic design) may be prohibitive. CGS feels that
a 20?foot setback from the downslope creep areas would give the
least problematic (and less costly) placement for foundations. All
parties at the meeting agreed that a plat note should be added addressing
this issue of building in the downslope creep area. The plat note
should read:
"Building
pads located within 20 feet of the downslope creep area (as delineated
by Entec) should have a thorough geotechnical investigation, signed
by a licensed professional engineer, to include a slope stability
analysis, that will determine what, if any mitigative and design
measures should be implemented for foundation. Locating septic systems
within this area is not recommended."
All
parties accept that other factors, such as septic location and design
may deem the hilltop in lot I not feasible. Septic designs and locations
must be approved by the County Health Department.
As
for the other concerns and issues with this property, the secondary
swales located in lots 1, 3, 7, and 8 should be avoided as locations
for building sites. If building sites are to be placed in these
areas, proper diversion of the water potentially carried by these
swales will be rerouted with adequate drainage sizing to prevent
foundation flooding and soil movement. Erosion control measures
set forth by the County and stated in the Community Covenants will
be followed during and after construction. CGS and Entec still recommend
lot?specific soils and percolation testing prior to construction.
All parties acknowledge that further geologic investigation may
deem areas as not suitable for building.
If
you have further questions about this site, please do not hesitate
to contact me at 303?8663518.
STAFF
NOTE: In telephone discussions with the Colorado Geological Survey
it was determined that the Geological Survey is satisfied that encroachment
near or into the downslope creep areas will require geotechnical
investigation. A note has been added reflecting this requirement.
EL
PASO COUNTY ENVIRONMENTAL SERVICES DEPARTMENT
The
Environment Services Department (ESD) has completed its review of
the Hay Creek Rezone from RR-3 to Planned Unit Development and Hay
Creek Ranch Preliminary Plan. Our review consisted of the following
items; wetlands, general wildlife resources, and federal and state
listed threatened or endangered species.
1)
According to the National Wetland Inventory maps and site visits,
the property does contain wetlands. A completed U.S. Army Corps
of Engineers permit should be provided to the El Paso County Planning Division prior to project commencement if ground disturbing activities
would occur in wetland areas. Specifically, there are two crossings
of Hay Creek proposed in the plan which must be addressed.
2)
The project, as proposed with its open space easement along Hay
Creek, should provide suitable space for wildlife. However, information
regarding additional wildlife protection measures should be provided
including fencing requirements, garbage containment, pets, enhancement/maintenance
of natural vegetation, and weed control as appropriate. Information
can be obtained from the Colorado Division of Wildlife.
3)
A No-Effect letter from the U.S. Fish and Wildlife Service (Service)
related to the Preble's meadow jumping mouse has been noted and
satisfies the county's request for consultation with the Service.
It
should be noted that the U.S. Army Corps of Engineers and the FWS
have regulatory jurisdiction over wetland and threatened and endangered
species issues, respectively. Thus, as indicated above, it is strongly
recommended that the developer obtain the necessary approvals from
the referenced federal agencies as part of their planning process.
FLOODPLAIN
- LOMA's will be required for each lot by owner but not as a condition
of approval of the PUD.
COMPREHENSIVE
PLANNING
This
request for a residential subdivision including 15 lots on 50.243
acres is located in the Twin Valley planning Sub-Area #6 of the
2000 Tri-Lakes Comprehensive Plan (1999). Although there are other
applicable elements of the Master Plan, some of which are touched
on later in these comments, this Twin Valley scenario is the most
pertinent element.
Conclusion
The recommendation of the Comprehensive Section is that a finding
of Master Plan consistency for this proposed subdivision can not
be made based on a proposed density greater than five (5) dwelling
units per acre. This is based on the first paragraph excepted from
the land use scenario excepted below. It should be noted that the
Comprehensive Section is taking a substantially different interpretive
position with respect to the Forest Lakes project just to the north,
based on its acknowledgement as a pre-existing plan.
If
this project is approved either at the proposed or a lower density,
it should participate in the Baptist Road Rural Transportation Authority
and in the upgrade of the railroad crossing as necessary and equitable.
Detailed
Comments
The
Twin Valley land use scenario is excerpted in its entirety below
with staff comments added as parenthetical language. Paragraph numbers
have been added for clarity of reference.
TWIN-VALLEY
- LAND USE SCENARIO
1.
This sub-area should remain primarily rural residential with lot
sizes averaging five acres exclusive of roads and tracts not devoted
to open space areas. Large lot clustering options, utilizing minimum
2 ½ acre lots should be considered only if there is strict
adherence to this overall density approach and if adequate mechanisms
for implementation are available.
(The
application is not consistent with this fundamental premise of the
Twin Valley scenario because the proposed densities are clearly
in excess of a five-acre overall average.
2.
Limited higher density mixed-use development may be appropriate
east of the Union Pacific rail right-of-way, providing adequate
facilities and services are available. If developed, these uses
should provide employment opportunities for residents of the Tri-Lakes
area.
(This
paragraph is not fully applicable, as the subject property us west
of the tracks. However, it underscores the direction that non-residential
uses should not be located within the subject property. In any case
he proposed plan, which is entirely residential, is fully consistent
with this provision)
3.
The previous land use approvals in the Forest Lakes project are
acknowledged, but it is noted that the development within this property
should be sensitive to the surrounding existing and planned lower-density
uses. For this reason, adherence to the originally approved clustering
plan is strongly recommended. Standard platting in accordance with
the existing R (Residential) zoning is strongly discouraged. Any
non-residential uses that may be proposed for this parcel should
be shown to clearly have cumulative development impacts equal to
or less than those of the approved plan do.
(This
paragraph is purposefully not directly applicable to the subject
property. However, it puts a focus on the obvious issue of a dual
standard for these 2 proposed developments).
4.
Regardless of its location, all development within Twin Valley should
be designed in a manner which is especially sensitive preserving
to the natural visual character of the area.
(The
Planning Division believes the proposed plan shows considerable
environmental sensitivity. Significant amounts of space will be
left open or will have development limitations.
5.
Various opportunities for acquisition and/or preservation of open
space should be pursued and implemented within this sub-area if
possible. The continued operation of one or more of the existing
ranches in Twin Valley should be encouraged through the use of conservation
easements or other means. Limited public access to the National
Forest land to the west should be considered, most likely through
the Forest Lakes property. The setting aside of areas within Twin
Valley as part of Prebles Mouse mitigation plan should be encouraged.
(The
proposed plan will result in the considerable permanent preservation
of land within this property, although the majority of the parcel
would be developed to varying degrees. Prebles Mouse habitat will
be preserved).
6.
Transportation access to this sub-area should be improved in a manner
which does not subject the area to undo development impacts and
pressures. West Baptist Road should be improved, and a second point
of access should be carefully considered and implemented if feasible.
A grade-separated rail crossing should be installed at the earliest
opportunity, and the County should continue to cooperate with property
owners in the upgrading of existing roads for acceptance into its
maintenance system.
(There
is a potential for this property to be burdened by a need for expensive
improvements (e.g. the rail crossing) which will have to be spread
across a very finite amount of low-density development.)
All
plans for new and expanded development should be carefully evaluated
and conditioned to provide assurances water supplies will be adequate
and water resources will be conserved. Options for using the existing
impoundments in the Forest Lakes development for renewable water
supplies should be fully considered. Options for reuse of non-potable
water from the Forest Lakes sewage treatment plant should also be
supported as an additional means of conserving water. The potential
impacts of future land and water development on existing shallow
wells should be carefully evaluated and approved plans should be
designed and conditioned to minimize these impacts.
(Comprehensive
Section is not aware of the specifics of the water plan for this
development)
Development
in this planning unit should be coordinated with the USAFA and then
Town or Monument and should be consistent with the goals and guidelines
set forth in the I-25 Corridor Visual Overlay.
(This
coordination has taken place to the extent that comments have been
sought from at least the Air Force Academy. Most of this particular
site is screened from I-25; most of the property that can be seen
will have a low density.)
The
El Paso County Parks, Trails and Open Space Plan depicts the property
as a high priority candidate for preservation, due to a fairly obvious
combination of high open space resource values. However, this document
was adopted with a condition that it not be used directly to limit
the otherwise reasonable development of privately owned property.
In the absence of an available buyer for the property as open space,
the Comprehensive Section suggests that it would be inappropriate
to deny this development plan on the basis that there is a community
interest in the property as open space
The
Master Plan for the Extraction of Commercial Mineral Deposits depicts
a combination of Stream Terrace and Mesa Gravel Deposits on the
subject property. Both of these deposits are fairly rare in undeveloped
locations and have a high probability of being commercially feasible
to mine on at least a sub-regional basis. This probability is borne
out by the presence of the active Dellacroce gravel mining operation
very close to this property. In order to allow a finding of consistency
the Board of County Commissioners should make a finding that these
deposits are in fact not that commercially feasible or, more probably,
that there are environmental factors (including, but not limited
to the Mouse) that make mining inappropriate even in the face of
other wise probable commercial feasibility. The applicant should
address this issue.
The
Major Transportation Corridors Plan (1987) depicts no major corridors
through the subject property.
The
El Paso County Wildlife Habitat Maps and Descriptors (1996) depict
all or most of the property as having a high potential for wildlife
habit. It is noted that substantial areas of Mouse habitat will
be protected.
NORTHERN
EL PASO COUNTY COALITION OF COMMUNITY ASSOCIATIONS
Letter
date November 30, 2001
The NEPCO Land Use Committee has reviewed this proposal and submits
the following comments on roads and density.
Transportation
is a major concern addressed in the Twin Valley- sub-area # 6 of
the 2000 Tri-Lakes Comprehensive Plan, because "Access to Twin-Valley
is limited to one two-lane road, West Baptist Road". Given
this "one road" limitation, all new development utilizing
Baptist Road should be required to participate financially in its
improvement. In previous correspondence with the El Paso County
Planning Division, the NEPCO Land Use Committee has identified
a need for traffic lights at I-25 and a grade-separated rail crossing.
These two road issues must be addressed by the applicant before
approval of the final plat.
The
2000 Tri-Lakes Comprehensive Plan also states that "This Sub-Area
should remain primarily rural residential." While this plan
provides an overall density of one unit per 3.35 acres, we are troubled
by its impact on adjacent landowners. This concern can be resolved
by increasing the setback on Lots 11 and 12 to 100', and by declaring
the "downslope creep area" as a "no-build area."
One other item is that "restrictions of height" are said
to be "mandated." Please specify these height restrictions.
To
summarize, we recommend approval of the Sketch Plan provided the
following conditions are met:
1)
Establish an appropriate financial commitment to Baptist Road improvements,
i.e. signal lights at I-25 and a grade-separated rail crossing.
2) Increase the setback on Lots 11 and 12 to 100'
3) Identify the "downslope creep area" as a "no-build
area."
4) Specify the height restrictions.
Thank
you for the opportunity to comment on this proposal.
Letter
dated February 16, 2002
The NEPCO Land Use Committee has had several conversations and visits
with the applicant regarding this project. They have responded to
all of our concerns. Given the level of cooperation we have experienced,
we wish to inform you of our complete support for this project.
As you may know, the intent is to subdivide the acreage for family
use. We feel comfortable that their desire to maintain a family
"farm" is a reasonable use for this property.
TRI-LAKES
LAND USE COMMITTEE
Thank
you for the referral on Hay Creek Ranch. The Tri-Lakes Land Use
Committee met on November 8th and reviewed and discussed the above
proposed PUD Rezoning and Preliminary Plan requests. As you know,
the site lies within the Twin-valley Sub-Area. Also relevant are
several of the Topical Sections; especially the one on Transportation.
The requested zoning will permit residential uses at an apparent
lot size of 2 acres and an overall density of 1 dwelling unit per
3.35 acres. The site adjoins unplatted parcels to the west, south,
east and north including large residential sites and larger ranch
lands. All are zoned RR-3.
The
residential density requested is not compatible with either the
existing residential uses in the neighborhood or the existing ranch
uses around the site. In part, the Twin-Valley Land Use Scenario
in the 2000 Update has this say:
"This sub area
should remain primarily rural residential with lot sites averaging
five acres exclusive of roads and tracts not devoted to open space
areas. Large lot clustering options, utilizing 2-1/2 acre lots should
be considered only if there is strict adherence to this overall
density approach and if adequate mechanisms for implementation are
available"
"Regardless of it's location, all
development within Twin Valley should be designed in a manner that
is especially sensitive to preserving the natural visual character
of the area."
Development
of this ranch in accord with the existing zoning and the intent
of the Comprehensive Plan would permit 10 lots assuming the private
roadway is permitted as indicated. Because open space would still
be necessary and likely remain where proposed, a 10 lot development
would still have 3 houses along the road and 7 on the ridge across
the creek. As currently proposed, the plan shows 4 houses on Hay
Creek Road and 11 on the ridge. The entire property is below and
visible from Hay Creek Road.
The
TLLUC specifically disagrees with the applicant's statement that
"Rezoning
of this property will be an asset tot he community and will produce
a higher quality of life, better public services, and an aesthetically
leasing architecture that will be an asset not only to the future
land owners, but also the Tri Lakes Area and El Paso County".
In fact, we foresee precisely the opposite. Also
"The
visual look of the property from the adjacent Hay Creek Road will
remain essentially unchanged". Or,
"there are no
changes on the "road" side of the creek". Not so.
We
do applaud the applicant's stated intent to restore the existing
barn, silo and homestead. And, although it is always desirable to
have more public trails in the Tri Lakes area, the one proposed
across this property seems of minimal value to the public since
it doesn't go anywhere. There is no such trail need identified in
the Comprehensive Plan at this location. Again, we applaud the initiative,
but it doesn't offset the density problem in any real way. The applicant
also states that wildlife preservation is paramount in the plan.
It is true that wildlife use the creek bottom to some degree and
will likely continue to do so - however, the wildlife that remain
in the area will be reduced in number and diversity simply because
of the increased density and human impact from both the residences
and the public use of the trail. Reducing the density is much more
likely to "help" the existing wildlife.
Finally
, there is an actual impact to the traffic on Hay Creek Road. Despite
the applicant's statements, the TLLUC believes that an additional
150 vehicle trips per day will surely be noticed by all. More importantly,
another 150 vehicles at the railroad crossing cannot simply be ignored.
The Comprehensive Plan, Section 5.0-Transportation, highlights the
inadequacy of many of the area roads. Baptist Road and the interchange
at I-25 are already understood by everyone to be inadequate. Any
relief there is years away at best, while already approved development
to the east continues to "pile in". The southerly extension
of Mitchell Road into the Twin Valley Sub Area was seen as a necessity
for safety sake as the railroad crossing on Baptist Road can be
(and has been) blocked for long periods of time, preventing all,
including emergency, access into the sub area. Future railroad use
is likely to increase rather than decrease further exacerbating
the problem. Even a Mitchell connection though, as unlikely as it
is, is only a partial solution. Already there are other development
pressures in the area which will affect this location. Ultimately,
everyone seems to recognize that there will be a need to cross Monument
Creek and the railroad right of way with a bridge of some sort.
Shouldn't this development be required to help?
In
summary, the approved Tri lakes Comprehensive Plan Update does not
support this proposal and the applicants have offered no solutions
to mitigate the impacts they propose to create.
DEPARTMENT
OF THE ARMY - CORPS OF ENGINEERS
This
replies to your November 1, 2001 letter regarding your proposed
two road crossings in Hay Creek near Monument, El Paso County, Colorado.
We have assigned Action No. 2001 00552 to this activity.
We
have studied the project description, other records, and documents
available to us. The proposed project is regulated under the provisions
of Section 404 of the Clean Water Act and a Department of the Army
Permit will be required for the project. This determination was
made because the road crossing are within jurisdictional waters
of the United States.
EL
PASO COUNTY PARKS DEPARTMENT Staff recommends fees in lieu of
land for regional park purposes in the amount of $4,185.00. Staff
also requests that Open Apace be parceled separately on plat.
E-mail
dated February 22, 2002
I have visited the site with the property owner. I request it be
noted on the plat that open space be labeled as a no build zone.
As per our conversation, it appears that the plat note does state
"Open Space No-Build Easement"; I feel that with this
plat statement any park staff concerns of open space within this
development have been addressed.
STAFF
NOTE: This addresses the initial statement by the Parks Department
requesting that the open space area be platted as a separate tract.
ENUMERATIONS
New
interior street will need to be named. If it will be a private street,
the designator will need to be Point, View, Grove or Heights.
Please
contact Liz Brown, El Paso County Sheriff's Dept., 390-2212, for
approval of new street name.
TRI
LAKES FIRE PROTECTION DISTRICT
1)
Any cul-de-sac greater than 500 feet in length must either have
a minimum 10,000-gallon holding tank, or a fixed consistent water
supply for the purpose of firefighting.
2)
A cul-de-sac on a private road must have a minimum diameter of 100
feet.
3)
The alternate approach would be for the two ways in and out of the
area.
MOUNTAIN
VIEW ELECTRIC
This
area is within MVEA certificated service area. MVEA will serve this
area according to our extension policy.
MVEA
requests the Final Plat show the 60-foot Private Roadway easement
will be shared as a Utility Easement. MVEA requests that platted
easements be shown with dimensions. MVEA requests there be utility
easements adjacent to the south boundary line of the open space
across Lots 1, 2 and 3. MVEA also requests platting of existing
MVEA facilities with easements on plat.
EL
PASO COUNTY SOIL CONSERVATION
Letter
dated November 26, 2001
The El Paso County Soil Conservation District has reviewed the PUD
request for the Hay Creek Ranch and has no comments regarding the
PUD request.
We
have also reviewed the Preliminary Plan for the Hay Creek Ranch
and have no significant comments. It appears from the plan that
the land below the access road to the homes will be set aside as
preservation property for the Prebles Meadow Jumping Mouse. If grazing
occurs on the open areas we would recommend that USFWS be contacted
to determine if grazing will impact the mouse habitat. Historical
use of the area has included grazing but the developers need to
assure themselves that confined animal grazing on the smaller lots
will not impact the mouse habitat.
Letter
dated December 20, 2001
I received a call from Jamie Hull who represents the Hay Creek Ranch
submittal concerning our comment on grazing issues in the proposed
development. He has clarified to our satisfaction that the covenants
that will be in place when the area is developed will prevent grazing
from impacting the mouse habitat area. With this discussion and
clarification we would have no further comments concerning the development
of this parcel.
LEWIS-PALMER
SCHOOL DISTRICT #38
Letter
dated November 29, 2001
At their regularly scheduled meeting on November 15, 2001, the Lewis-Palmer
Board of Education voted to oppose the above referenced project
until such time as the developer meets with school district officials
to discuss the impact this project would have on student enrollment
growth and school facilities.
Letter
dated December 12, 2001
Earlier today James Hull, developer of Hay Creek Ranch, met with
me and described the plans for development of Hay Creek Ranch. He
explained that this property will be reserved for members of one
extended family and that the current farmhouse will be refurbished
for their use. In light of Mr. Hull's explanation of his plans,
I now believe that the school district would be impacted only minimally
by this project and that the school district can now support the
development.
COLORADO
STATE FOREST SERVICE
Letter
dated November 19, 2001
I have reviewed the wildfire report submitted with this proposal.
It meets with CSFS approval for the purpose of the preliminary plan.
What I would like to see submitted with the final plat would be
a plan on how the developer plans to mitigate the hazard in the
"severe hazard" rated areas.
Letter
dated December 20, 2001
I have just received a copy of the covenants for this proposed subdivision.
In my opinion these adequately address the concerns I had in my
letter dated 11/19/01.
UNITED
STATES AIR FORCE ACADEMY
1)
Due to the proximity of this planned development to our main airfield's
approach/departure corridors (specifically I-25 and Woodcarver Rd.)
and training aircraft flight paths, please include the following
notice on this project's final plat:
NOTICE:
This property may be impacted by noise and other affects of flight
by aircraft used in the United States Air Force Academy's Airmanship
Program. In conjunction with this notice, the Grantor's (Hay Creek,
LLC) agree to waive and release any right or cause of action which
they now have or may have in the future against Grantee (the United
States Air Force Academy), its successors and assigns, due to noise
and other affects by operation of such aircraft. This notice shall
be in effect until the Air Force Academy shall cease to be actively
used. This notice shall run with the land.
2)
Due to the proximity of this planned development to our field training
activities in Jack's Valley, please include the following notice
on this project's final plat:
NOTICE:
This property may be impacted by noise and other affects of combat
field training conducted at the United States Air Force Academy's
Cadet Basic Training, Jack's Valley Training Area. In conjunction
with this notice, the Grantors (Hay Creek, LLC) agree to waive and
release any right or cause of action which they now have or may
have in the future against Grantee (the United States Air Force
Academy), its successors and assigns, due to noise and other affects
by field training operation. This notice shall be in effect until
the Air Force Academy shall cease to be used for training purposes.
This notice shall run with the land.
3)
The AFA will not agree to upstream developments releasing onto our
property above historic flows. Please verify in writing back to
my department that this development will be releasing flows onto
AFA at historic rates prior to your approval of this development
plan.
The
following agencies have not responded:
Town of Monument
El Paso County Department of Health and Environment
Planning Division COMMENTS
·
This request is for Preliminary Plan approval for a 15 lot residential
subdivision of approximately 50.02.
·
A PUD (Planned Unit Development) zone change request accompanies
this Preliminary Plan. The PUD zone classification has been pursued
to allow the applicant to work with the challenging terrain, floodplain
and Prebles Meadow Jumping Mouse Habitat yet allow the creation
of the number of lots required to make the project financially feasible.
·
The applicant has designated an open space area in the center of
the proposed development. The open space area encompasses Hay Creek
and its actual associated 100-year floodplain as proposed. The actual
FEMA mapped floodplain departs from the channel (thalweg) along
a majority of the creek. Individual LOMA's (Letter of Map Amendments)
will be required on some of the lots prior to issuance of building
permits in areas of the mapped floodplain.
·
Water and sewer service will be provided by individual well and
septic systems. A plan for augmentation is underway but not yet
approved by the water courts. There is currently a finding of insufficiency
regarding water. The Health Department has indicated that the proposed
lots will accommodate septic systems. For those lots that have a
limited buildable area staff has agreed that some components may
be located in the open space area within certain parameters. A plat
note has been added to address this potentiality (Note 16).
·
This area is in an area covered by Tri-Lakes Comprehensive Plan.
Specifically, the proposal is located in the Twin Valley sub area
of the plan. The Twin Valley - Land Use Scenario has the following
recommendation:
This
Sub-Area should remain primarily rural residential with lot sizes
averaging five acres exclusive of roads and tracts not devoted to
open space areas. Large lot clustering options, utilizing minimum
2 ½ acre lots should be considered only if there is strict
adherence to this overall density approach and if adequate mechanisms
for implementation are available.
The
applicant's proposal has a density of 1 unit per 3.35 acres. For
this reason the applicant's proposal is inconsistent with the Tri-Lakes
Comprehensive Plan. The applicant has provided an exhibit illustrating
a lot layout utilizing the existing five-acre minimum lot size RR-3
zoning. The exhibit shows ten (10) lots with some lots gaining access
directly from Hay Creek Road and some lots gaining access to Hay
Creek via flagstems. Staff holds that the five-acre density requirement
can also be achieved utilizing the PUD zone district.
·
Access is from Hay Creek Road via a private road terminating in
a cul-de-sac. The road makes one crossing of Hay Creek. The use
of private roads are limited and permitted only upon approval of
the Planning Commission and the Board of County Commissioners. The
use of private roads are permitted in the PUD zone district and
are confined to closed loops and dead-ends not likely to be needed
for the convenience and safety of the general public. Lots 12 &
13 will gain access from Hay Creek Road via a shared ingress and
egress access easement. Lot 14 will be accessed via a cross lot
ingress and egress easement crossing Lot 15. Access to Lots 1, 2
& 3 is also via cross lot easements. Reciprocal access and maintenance
agreements will be required during the final plat process.
·
There are three waivers associated with this request:
Waiver of Section 49.2.C.3.2.a pertaining to the reduction of right-of-way
width where suitable alternative provisions are made for pedestrian
walkways and utilities.
Waiver
of the El Paso County Paving Policy.
The
applicant is asking for a waiver of the right of way requirement
of 60' and is proposing a right of way of 40'. The applicant is
also asking for a waiver of the Paving Policy that requires roads
that connect to paved roads also be paved. Primarily the logic behind
this requirement is that it prevents two different types of equipment
from being dispatched to perform maintenance. In a situation involving
a private road the homeowner's association is responsible for providing
maintenance to the private road so it eliminates the concern regarding
the dispatching of two types of maintenance equipment. DOT has indicated
that they are not opposed to the waiver requests.
Waiver
of the requirement requiring a curve radius of 300 feet. A curve
radius of 150 feet is proposed.
·
There are areas of downslope creep and slopes of 30% and greater
on the subject property. Slopes at or exceeding 30% have been designated
as no-build areas on the plan as required by the El Paso County
Land Development Code. Note number five (5) in the General Notes
section addresses this issue. Areas of downslope creep have not
been eliminated as areas of construction but will require both geo-technical
investigation and engineered site plans. Section 49.2.E of the El
Paso County Land Development Code states:
Land
subject to natural hazards shall be identified by the subdivider,
subject to existing county hazard inventories. Such land shall not
be developed until such time as the hazard has been removed or the
impact of said hazard mitigated as determined by the Planning Director.
Lots subject to hazards which may be eliminated through specialized
engineering shall be so identified on the plat. Identification of
such hazards shall include a statement of the specific hazard and
a statement of the engineering alterations required to eliminate
the hazard.
·
The subject property contains what has been identified by El Paso
County as Preble's meadow jumping mouse habitat. The applicant has
obtained a No Effect letter for the United States Fish and Wildlife
Service. The Service found that the mouse is not likely to be present
within the subject area. The possession of the No Effect letter
does not preclude the applicant from complying with the Endangered
Species Act (ESA).
Planning Division RECOMMENDATION: A request for rezoning to PUD (Planned
Unit Development) is running concurrent with the Preliminary Plan.
If the PUD (Planned Unit Development) rezoning request is denied
the Preliminary Plan must be denied. If the PUD (Planned Unit Development)
rezoning request is approved staff recommends approval of the Preliminary
Plan. If the Preliminary Plan is approved, approval should be subject
to the following conditions and notations:
CONDITIONS
1. Prior to the submission of a Final Plat, the Preliminary Plan
shall be revised to reflect the following:
A.
Remove the gray coloring from the drawing. Use some sort of hatching
pattern to delineate the area previously delineated by the gray
coloring.
B.
Add a note to the Preliminary Plan with the following text:
A
site plan prepared by a professional engineer, currently registered
in the state of Colorado shall be required for any structure located
in or within twenty (20') feet of the delineated downslope creep
area.
C.
Add the following note to the Preliminary Plan:
Septic
systems shall not be permitted within the area(s) delineated as
downslope creep areas.
D.
Delete the reference "AND PRESERVATION" from the callout
within the open space easement.
E.
All drainage and transportation issues shall be resolved to the
satisfaction of the El Paso County Department of Transportation.
F.
Remove Note 4
2.
Applicable School, Park and Drainage fees shall be paid with the
Final Plat.
NOTATIONS
1. In conjunction with the Final Plat process, the applicant shall
be required to contribute or cause to be contributed to El Paso
County, a pro-rata proportionate share for a two-lane grade-separated
arterial rail crossing on Baptist Road.
2.
According to Section 47 C. 10. c. of the El Paso County Land Development
Code, approval of the Preliminary Plan will expire after twelve
(12) months unless a Final Plat has been approved and recorded or
a time extension has been granted.
ENCLOSURE
Vicinity Map
Letter of Intent
Preliminary Plan
Planning Commission Resolution
Prepared
by
Mike Hrebenar
5/14/02
|